WH-AS5 - Intervention Trade-Off Analysis

Aims

Compare the individual and combined effects of the storage assignment, layout, and picking interventions developed in AS2 through AS4. Use the activity profiles and baseline from AS1 to evaluate warehouse performance, feasibility, and resource requirements. Recommend a feasible course of action and explain its trade-offs and limitations.

NoteReport negative results

Your proposed approach does not need to perform better than the baseline. Scientific reporting includes findings that do not support the expected outcome, including null results.1 As Thomas A. Edison put it during his storage-battery experiments:

“I know several thousand things that won’t work.”2

If an expected improvement does not occur, report that negative result. Report the evidence factually, including unchanged or worse performance. Explain the performance gap as far as your evidence allows. Distinguish supported explanations from hypotheses, and suggest changes or further experiments that could improve performance. Keep the comparison fair.

Learning objectives

After completing this assignment, you will be able to:

  • define compatible scenarios from storage, layout, and picking decisions;
  • distinguish isolated intervention effects from combined design effects;
  • assess performance and resource trade-offs under common assumptions; and
  • justify a feasible recommendation using sensitivity results and limitations.

Study case

Use the same SPR warehouse, cleaned data, activity profiles, and baseline as in AS1 through AS4. Table 25.1 identifies the earlier results used in the comparison.

Table 25.1: Evidence from AS1 through AS4 used in the intervention comparison.
Earlier analysis Use in the intervention comparison
WH-AS1 - Diagnosis and activity profiling Baseline conditions, demand, activity profiles, and KPIs that define the problems and evaluation scope.
WH-AS2 - Storage location assignment and space requirements Current and proposed assignments, storage requirements, and replenishment and capacity constraints.
WH-AS3 - Warehouse Layout Improvement Current and proposed layouts, space use, distances, handling interfaces, and feasibility conditions.
WH-AS4 - Order-Picking Improvement Picking strategies and performance estimates for the current warehouse and retained designs.

State the assumptions, missing inputs, and feasibility limits that affect the comparison. Distinguish observed warehouse facts from assumptions and calculated results.

Compare the interventions and their combinations

Compare the baseline, isolated interventions, and retained combinations of storage assignment, layout, and picking decisions. A combination of changes may perform better than any isolated intervention, or introduce costs and constraints that outweigh its benefits. Identify the feasible option that best meets your chosen objectives, based on the evidence.

Figure 25.1 shows an example with one baseline and one proposed option for each decision. The three choices produce eight configurations, listed in Table 25.2. Activity profiling provides the common data and operational diagnosis for all scenarios.

The labels S0 through S7 are short identifiers for the scenarios in this example. S0 identifies the current situation, and each other label identifies a specific combination of decisions. The numbers do not rank performance.

You may choose descriptive names such as “Current warehouse”, “Picking change only”, or “New layout with revised storage and picking”. Define the layout, storage assignment, and picking policy for each scenario.

Figure 25.1: Eight configurations combine baseline and proposed layout, storage assignment, and picking options. S0 is the current situation. The branches follow layout design, product assignment, and picking evaluation.
Table 25.2: Scenario definitions for one baseline and one proposed option per decision. These rows define configurations, not performance results.
Scenario Layout (AS3) Storage assignment (AS2) Picking (AS4)
S0 Baseline Baseline Baseline
S1 Baseline Baseline Proposed
S2 Proposed Baseline Baseline
S3 Proposed Baseline Proposed
S4 Baseline Proposed Baseline
S5 Baseline Proposed Proposed
S6 Proposed Proposed Baseline
S7 Proposed Proposed Proposed

S1, S2, and S4 isolate picking, layout, and storage changes relative to S0. S3, S5, S6, and S7 combine changes. S7 need not be the best scenario. If you retain more than one proposed option, extend the scenario definitions and explain which options you compare.

Check scenario compatibility

The order of analysis depends on the design decisions. A new layout may need a new product assignment before picking can be evaluated.

For example, a proposed reserve and forward-picking arrangement creates areas that must be populated with products. Apply and justify a suitable assignment strategy, heuristic, or optimization model for those areas before evaluating the picking operation. Use the resulting product locations, aisle geometry, depots, capacity, and replenishment interfaces in the picking analysis.

When applying a baseline storage assignment or picking policy to a proposed layout, explain how it operates there. Check compatibility and explain any changes needed. If the current product assignment or picking policy cannot operate in the new layout, record that combination as infeasible or explain why you exclude it. Keep the observed current situation identifiable as the baseline under your chosen scenario name.

Evaluation requirements

Evaluate the retained combinations of layout, storage assignment, and picking decisions. For each scenario, state the assumptions, resource requirements, and feasibility status. Compare its performance with S0 and quantify the differences. Include failed or infeasible evaluations and explain their status. Distinguish unavailable results from zero values.

Use the same product population, workload, demand period, units, and evaluation assumptions across scenarios. Include uncertainty and sensitivity results where they affect the recommendation.

Compare scenarios that differ in one decision to understand the effect of that decision under the other settings. For example, S0 versus S1 measures a picking change in the current design, while S6 versus S7 measures that picking change with the proposed storage and layout. S0 versus S7 measures the combined change. Explain why the combined effects differ from the effects of isolated interventions. Account for changes in replenishment, capacity, labor, equipment, or service where relevant.

Management recommendation

Recommend a feasible scenario, or explain the conditions under which you would choose between alternatives. Explain the performance differences, resource requirements, feasibility conditions, and limitations that support your choice. Prioritize the proposed actions, explain their implementation sequence, and identify what management should monitor. Limit claims about the best solution to the alternatives and assumptions evaluated. Claim global optimality only when your method and evidence establish it.

Assessment criteria

Table 25.3 gives the rubric for the comparison and management synthesis developed in AS5. Each criterion is worth 2 points, for a total of 10 points.

  • 2 points: complete, correct, and decision-relevant evidence.
  • 1 point: partially convincing evidence with a material omission, weakness, or minor error.
  • 0 points: missing evidence or evidence that is materially incorrect, infeasible, or unsupported.
Table 25.3: WH-AS5 rubric.
Criterion (2 points each) Evidence expected for full credit
Fair comparison Product-assignment, layout, and picking interventions are compared using consistent baselines, demand, units, and constraints.
Performance trade-offs Effects on cost, throughput, space, service, workload, and risk are quantified where the evidence permits.
System interactions Complementarities, conflicts, and shifted burdens across the three interventions are identified.
Uncertainty and robustness Material assumptions, sensitivities, data limitations, and implementation risks are tested or bounded.
Management synthesis The report provides a concise, prioritized course of action with conditions, sequencing, and monitoring indicators.

For report format and reproducibility requirements, see the project file requirements.

References

Dyer, Frank Lewis, and Thomas Commerford Martin. 1910. Edison: His Life and Inventions. Harper & Brothers. https://www.gutenberg.org/cache/epub/820/pg820-images.html#link2HCH0024.
National Academies of Sciences, Engineering, and Medicine. 2017. Fostering Integrity in Research. The National Academies Press. https://doi.org/10.17226/21896.
Nature. 2020. “In Praise of Replication Studies and Null Results.” Nature 578: 489–90. https://doi.org/10.1038/d41586-020-00530-6.

  1. See the Nature editorial on null results and Recommendation 8 of the National Academies report on research integrity (Nature 2020; National Academies of Sciences, Engineering, and Medicine 2017, Recommendation 8).↩︎

  2. An account by Edison’s associate W. S. Mallory appears in Chapter XXIV, “Edison’s Method in Inventing” of Edison’s authorized biography (Dyer and Martin 1910, chap. 24).↩︎